The difference between planning permission building regulations approval
Contents |
[edit] Introduction
People unfamiliar with the development process can become confused by the number of permissions that are necessary, and in particular, the difference between planning permission and building regulations approval.
In fact, whilst they may (but are not necessarily) both be granted by the local authority, they are very different.
[edit] Planning permission
Planning permission is the granting of permission to proceed with a proposed development. Responsibility for granting permission generally lies with local planning authorities (usually the planning department of the district or borough council). All developments require planning permission, other than ‘permitted developments’, which are considered to have insignificant impact.
The Ministry of Housing, Communities and Local Government (MHCLG) decides national planning policy for England and this is set out in the National Planning Policy Framework. Considerations about whether to grant planning permission might include; siting, size, use, context, access, compliance with the local plan and national planning policy and so on. The legislation, policy and guidance that underpins planning in England can be found on the government's National Planning Practice Guidance website.
For more information see: Planning permission.
[edit] Building regulations approval
The building regulations set out requirements for specific aspects of building design and construction. In England, the Ministry of Housing, Communities and Local Government (MHCLG) is responsible for setting the building regulations. The regulations apply to most new buildings and many alterations to existing buildings, and relate to aspects of building design and construction such as; fire safety, structure, accessibility, ventilation, drainage and so on. A series of approved documents provide general guidance about common situations in building design and construction and how they can comply with the building regulations.
Building Regulations approvals can be sought either from the building control department of the local authority or from an approved inspector. Generally on larger, new-build projects, a 'full plans' application will be made, meaning that full details of the proposed building works are submitted for approval before the works are carried out. On small projects, or when changes are made to an existing building, approval may be sought by giving a 'building notice'. In this case, a building inspector will approve the works as they are carried out by a process of inspection.
When the works are complete, a completion certificate is issued by the building control body, providing formal evidence that the works have been approved, and that, in so far as it is reasonable to determine, they have been carried out in accordance with the building regulations.
For more information see: Building Regulations.
[edit] Related articles on Designing Buildings Wiki
- Approved documents.
- Approved inspector.
- Building control body.
- Building regulations.
- How long does it take to get planning permission.
- How long does planning permission last.
- How long it takes to get building regulations approval and how long it lasts.
- Listed buildings.
- Local plan.
- Main types of planning permission.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Permitted development.
- Planning fees.
- Planning objection.
- Planning permission.
- What approvals are needed before construction begins.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February